643.640. Emission standards to be developed for certain carbon dioxide sources — unit-by-unit analysis required, procedure — severability clause. — 1. The commission shall develop emission standards under 42 U.S.C. Section 7411(d) and 40 CFR 60.24 through a unit-by-unit analysis of each existing affected source of carbon dioxide within the state. As used in this section, "unit-by-unit analysis" means an analysis of each generation plant individually, regardless of the number of turbines at each plant site.
2. The commission shall consider in developing and implementing emission standards for each existing affected source of carbon dioxide, among other factors, the remaining useful life of the existing affected source to which such standard applies, consistent with 42 U.S.C. Section 7411(d).
3. The commission shall consider, consistent with its statutory duties to achieve the prevention, abatement, and control of air pollution by all commercially available and economically feasible methods, the overall economic impact from any and all emission standards and compliance schedules developed and implemented under 42 U.S.C. Section 7411(d).
4. The commission may develop, on a unit-by-unit basis for individual existing affected sources and emissions of carbon dioxide at these existing affected sources, consistent with 40 CFR 60.24(f), emission standards that are less stringent, but not more stringent, than applicable federal emission guidelines or longer compliance schedules than those required by federal regulations. This determination shall be based on:
(1) Unreasonable cost of control resulting from plant age, location, or basic process design;
(2) Physical impossibility of installing necessary control equipment; or
(3) Other factors specific to the existing affected source or class of existing affected sources that make application of a less-stringent standard or final compliance time significantly more reasonable, including, but not limited to, the absolute cost of applying the emission standard and compliance schedule to the existing affected source; the outstanding debt associated with the existing affected source; the economic impacts of closing the existing affected source, including expected job losses if the existing affected source is unable to comply with the performance standard; and the customer impacts of applying the emission standard and compliance schedule to the existing affected source, including any disproportionate electric rate impacts on low-income populations.
5. As required by 40 CFR 60.26, the commission has legal authority to carry out any state implementation plan with emission standards and compliance schedules that are developed and implemented consistent with this chapter.
6. If any provision of this section or the application thereof to any person or circumstance is held invalid, such invalidity shall not affect other provisions or applications of this section that can be given effect without the invalid provision or application, and to this end the provisions of this section are declared to be severable.
--------
(L. 2014 H.B. 1631 merged with S.B. 664)
---- end of effective 28 Aug 2014 ----
|
|||
Click here for the Reorganization Act of 1974 - or - Concurrent Resolutions Having Force & Effect of Law | |||
In accordance with Section 3.090, the language of statutory sections enacted during a legislative session are updated and available on this website on the effective date of such enacted statutory section. | |||
|
Recent Sections | Editorials | May Be Cited As | Tables & Forms | Multiple Enact |
Repeal & Transfer | Definitions | End Report | ||
|
||||
Site changes | Pictures | Contact |
Legislative Research | Oversight | MOLIS | |||
Library | MO WebMasters |